Replacement steps of eccentric hemisphere valve packing - high-temperature hemisphere valve - Wenzhou Deyue Valve Co., Ltd

Replacement steps of eccentric hemisphere valve packing

Published on: August 13, 2020 Font size: large    in    Small
Here is Replacement steps of packing:
(2) Close the eccentric hemisphere valve.
(3) Unscrew the nut and remove the washer, wrench head and handle.             
(4) Unscrew the nuts and remove the spring washer, valve stem stopper and packing gland.
(5) Take out the packing of eccentric hemisphere valve.
(6) Check the disassembled parts, repair and replace them in time if they are damaged, and clean each part.
(7) Lubricate the stuffing box sealing face.
(8) Place new packing.
(9) The installation procedure is the reverse of the removal procedure.
 Pneumatic eccentric hemisphere valve